Silkyara tunnel rescue
Uttarakhand tunnel rescue: Pipe-laying completed, workers to be evacuated soon
Ambulances ready, road being repaired to rush workers trapped in Silkyara tunnel to hospital
Rat-hole miners begin manual drilling, vertical boring makes big headway
Uttarkashi Tunnel rescue: 50 metres vertical drilling done, 5-6 meters to go
Uttarkashi Tunnel rescue: How long rat-hole miners will take to dig remaining 12 metres?
Uttarkashi Tunnel rescue: Rat-hole miners begin manual horizontal drilling
Uttarkashi tunnel rescue: Vertical drilling done up to 31 of 86 metres
Uttarkashi Tunnel rescue: Parts of auger machine removed from rubble
Uttarkashi tunnel rescue: Rescue shaft reaches 20 metres on first day